Project case study · Palm Desert

Kitchen, Living Room, Master Bath Electrical Remodel in Palm Desert

A full electrical update for a remodel inside Palm Valley Country Club: layered lighting, new controls and code updates, finished around marble, quartz and a sloped ceiling.

Location
Palm Valley Country Club, Palm Desert, CA
Project
Residential remodel - kitchen, great room, primary bath
Remodel timeline
About 6 weeks (full project, all trades)
Contractor
Licensed C-10 Electrical - CSLB #1151468

Project video Watch the project

Drag to compare Before & after

Finished double vanity under three new recessed lights Marble vanity wall before lighting, with three recessed light cutouts and taped device layout
Vanity wall: three recessed lights planned and cut into finished tile.
Brass chandelier installed under the bathroom skylight Skylight ceiling with the new fixture box set in the open beam before the chandelier
Under the skylight: new box set in the beam, then the brass chandelier.
Finished marble shower with recessed light Shower framed with backer board, first recessed light installed
Shower: recessed light set before tile, finished in marble.
Great room with vaulted ceiling and covered chandelier during the remodel, Palm Valley Country Club
Finished great room and kitchen with recessed lighting and island chandelier
The great room and kitchen, before and after.

Under the slab to finished The kitchen island

The new island needed power where there was none. We trenched the slab, ran conduit, and finished with a switch and GFCI set into the quartz.

  1. Trench cut in the slab with conduit run to power the new kitchen island
    01Trench the slab

    Conduit run under the slab to the island.

  2. GFCI outlet and switch set into the waterfall quartz island
    02Power at the island

    New switch and GFCI set into the waterfall quartz.

  3. Island chandelier assembled on site before hanging
    03Assemble on site

    The chandelier assembled before hanging.

  4. Finished island chandelier lit above the kitchen
    04Lights on

    Controlled from the new island switch.

Scope of work What we did

  • Installed 16 new recessed lights across the great room, kitchen and primary bath
  • Installed a new chandelier over the kitchen island and replaced the existing great room chandelier
  • Added a new switch location at the island to control the chandelier
  • Ran underground conduit under the slab to bring power to the island
  • Installed new GFCI protection in the island and the bathroom
  • Added an occupancy switch for the new bathroom exhaust fan
  • Put the primary bath lighting on a dimmer

How we work The challenge

Every box in the bathroom was cut into finished marble stone, where there's no second chance. The vaulted ceiling meant fishing wire along the slope with very little access. We laid out every light and device by hand and by laser before cutting, so each one landed centered and square.

  1. Hand-drawn lighting and mirror layout on the wall before rough-in
    01Plan it.
  2. Laser and tape layout on the floor to place lights and devices
    02Lay it out.
  3. Electrical box set cleanly into large-format marble tile
    03Cut once.
  4. GFCI outlet installed in a quartz backsplash
    04Done right.

Finished work The result

The full remodel ran about six weeks, with our electrical work coordinated around the other trades.

Palm Desert and beyond More projects.

All projects
Finished reception at The Beauty Bar on El Paseo: light frame, crystal chandelier, the salon sign and the marble desk Next project Commercial TI — Palm Desert The Beauty Bar on El Paseo

Get started Planning a remodel in the Coachella Valley?

Licensed C-10 electrical contractor. Call or request a quote and we'll walk the project with you.