Surgery Center Electrical in Palm Desert

A medical office in Palm Desert is being converted into a surgery center, and we’re the electrical contractor. The old system came out, and a new 120/208V main switchboard, a new underground service path, sub panels and code-required backup power are going in, wired to commercial standards.

Active work ·

Location
Palm Desert
Project type
Commercial: medical office converted into a surgery center
Status
Active work, started December 2025
Service
New 120/208V main metered switchboard, sub panels and a new service path from the utility transformer
Backup power
Code-required; the design is moving from a generator to a battery system
Contractor
Power On Solutions LLC, licensed C-10 electrical contractor (CSLB #1151468)

Project video The work so far

Ten months of progress Then & now

The suite stripped to the slab and ceiling grid at the start of the Palm Desert surgery center conversion, Dec 2025 Dec 2025
New rooms framed in metal studs under open ceilings and ductwork, Palm Desert surgery center, Sep 2026 Sep 2026
The suite stripped to the slab and ceiling grid. Then the new rooms framed under open ceilings.
Green laser lines marking the new room layout on the floor and walls of the Palm Desert surgery center suite, Dec 2025 Dec 2025
Metal stud framing for the new rooms looking toward the windows, Palm Desert surgery center, Sep 2026 Sep 2026
Room lines laid out with a laser. Then the walls framed on the new layout.

Behind the walls Built for a medical space, and for the next service call

For a GC, an owner or an engineer, how the wiring goes in matters as much as what’s on the plans. Here’s what’s going into this space so far.

  1. A box and EMT conduit set on the metal studs beside the patched floor, Palm Desert surgery center, May 2026
    01Boxes on the studs
  2. Underground conduit run through the trench and turned up as stub-ups before the slab was poured back, Palm Desert surgery center, May 2026
    02Underground conduit
  3. Main EMT conduit runs strapped to the framing above the ceiling grid at the Palm Desert surgery center
    03EMT main runs
  4. Ceiling rough-in along the roof framing above the new rooms, Palm Desert surgery center, Oct 2026
    04Ceiling rough-in
  • New runs went into the trenches before the floor was closed, so the slab is opened once.
  • Main runs in EMT conduit, routed clean above the ceiling for future service access.
  • Dedicated circuits for the equipment a surgery center runs on: rooftop units, mini-splits, HEPA filtration and surgical arm lights.
  • Backup power planned with the general contractor and the engineer, so the panels and the transfer switch match what the building actually needs to keep running.

Scope of work What we’re doing

  • Demo of the old electrical throughout the former medical office.
  • New 120/208V main metered switchboard.
  • New service path from the utility transformer, with underground and attic conduit runs.
  • New sub panels.
  • Transfer switch for the code-required backup power.
  • New wiring, circuits, devices and lighting throughout.
  • Circuits for the rooftop units (RTUs), mini-splits, HEPA filtration units and surgical arm lights.
  • Load review for the backup power, with the general contractor and the engineer.

How we work The challenge: backup power

A surgery center needs code-required backup power. The first design called for a diesel generator, and we reviewed its size against the plans and our own site notes. The generator’s location wasn’t approved, so the design is moving to a battery backup system. The engineer is revising the drawings, and the owner asked for our input on which loads the battery system needs to carry.

  1. 01Size it

    Generator size reviewed against the plans and site notes.

  2. 02Placement

    The generator location was not approved.

  3. 03Rethink

    A battery backup system proposed instead.

  4. 04Redraw

    Engineer revising the drawings, with our input on the loads.

Active work Where it stands

Work started in December 2025. Demo, layout and the underground are done, the new rooms were framed in September 2026, and ceiling rough-in is under way. Next up: finishing rough-in, then the switchboard, panels and backup power equipment.

Palm Desert and beyond More projects.

All projects
Finished reception at The Beauty Bar on El Paseo: light frame, crystal chandelier, the salon sign and the marble desk Next project Commercial TI — Palm Desert The Beauty Bar on El Paseo